AddiWire

Additive manufacturing news and European prices, with independent expert commentary

Topics

Quality and inspection

Analysis by Svetozar Kolesar

How a single part gets qualified for production

A qualified process does not mean every part is good. How the scope of verification follows the part's criticality, the three acceptance stages in ISO/ASTM 52901, and what is actually tested on the part.

Latest news

Industrial AM

Home PC-ABS prints match Stratasys Fortus parts in most tests

A video test by Igor of My Tech Fun compared PC-ABS parts from a Stratasys Fortus 450mc with parts from a Prusa Core One L and a Bambu Lab H2D using Polymaker filament. The industrial parts were more dimensionally accurate, while the home prints looked better, and mechanical differences were mostly small.

1 source
Aerospace and defence

Stratasys gets $7.8 million to build in-process quality monitoring for FDM

Stratasys has been awarded $7.8 million through the 2026 America Makes and Department of War Organic Industrial Base Modernization Challenge. The 24-month project will develop on-site quality assurance for the F3300 and F900 industrial FDM platforms. The aim is to generate process data during the build and so reduce reliance on post-build inspection and qualification.

1 source